Bridge Demolition and
Removal.
Brawley, California
APEX recently completed the
demolition and removal for two bridge abutments at the New River Bridge
located in Brawley, California. A layer of asbestos sheeting positioned
between the bridge decking and the foundation abatement required special
handling. Prior to beginning work APEX completed a comprehensive work plan
and health and safety plan, obtained the appropriate regulatory approval and
secured proper permits. The work consisted of the demolition of both bridge
sections. The careful removal of the asbestos sheeting and appropriate
disposal of all construction debris and hazardous waste. All work was
completed in level C protection and properly monitored by an on-site
certified asbestos consultant. APEX quality effort allowed the project to
proceed on schedule with a minimal amount of delay.
Service Station Closure
APEX recently completed a
number of service station decommissions and remediation system decommissions
and destructions for several valued clients. The most recent project
consisted of abandoning five 2-inch SVE wells advanced to 30 feet, three
2-inch monitoring wells advanced to 80 feet, 700 linear feet of 2-inch
piping, and a treatment compound removal. With a three-man crew, APEX
completed this project in a single day, on time and within budget.
|